Popular now
Debenhams Group returns to growth amid PLT recovery

Debenhams Group returns to growth amid PLT recovery

Currys appoints Fredrik Tønnesen as Group CEO

Currys appoints Fredrik Tønnesen as Group CEO

Inditex sales rise 5.8% after strong start to summer trading

Inditex sales rise 5.8% after strong start to summer trading

Intu submits plans for £168m face-lift at Lakeside centre

Intu submits plans for £168m face-lift at Lakeside centre

On this episode of Talking Shop I’m joined by Alain Bejjani—former Group CEO of Middle East retail giant Majid Al Futtaim, and author of the definitive new book, NEXT: Leading Through the New Realities. Drawing on his childhood in war-torn Beirut, and his experience steering a $9.5bn dollar retail and lifestyle empire through a global pandemic, Alain brings an unmatched perspective on leadership under pressure. Today, we break down his crisis survival playbook for retailers operating in distress. We discuss why resilience must always outpace efficiency, the four assets a brand must protect at all costs, and how to turn macro-turmoil into a long-term direction that scales.

Register to get free articles

No spam Unsubscribe anytime

Want unlimited access? View Plans

Already have an account? Sign in

Shopping centre operator Intu has submitted plans to Thurrock Council for a £168m development of its Lakeside centre.

The proposal will look to extend the centre north and eastwards creating around 40,000 sqm of retail space, with plans for a new department store and floorspace for shops, cafés and restaurants. In total 30 to 40 new stores have been proposed.

The current Debenhams store will be partly demolished and rebuilt to facilitate the extension, a new bus station will also be created in on the east side, close to the local train station.

A new multi-storey car park at the northern end for replacement car parking, alongside greater pedestrian and cycle links. And a public space, will be on the north-eastern end of the shopping centre are also included in the plans.

Construction is expected to last for three years, with Intu claiming the new development will create around 1,500 new jobs and 900 “indirect jobs”.

Intu has been contacted for comment.

Previous Post
Debenhams names new CEO as chairman Duddy steps down

Debenhams names new CEO as chairman Duddy steps down

Next Post
Future proofing your brand in the age of the Sci-Fi shopper

Future proofing your brand in the age of the Sci-Fi shopper